Our Project / Our Service
Domestic
  • 3.3 MW Solar Power Plant (Phase 1, Petchaboon)

The global warming crisis is now seen as a major threat to the future of the earth. Many organizations including governments and companies in the private sector are involved in addressing this crisis. Generating power from renewable energy sources such as biomass, wind and solar is a viable way to deal with this issue. Gunkul Engineering Plc is well aware of the adverse consequences of this threat. That is why GUNKUL is expanding beyond offering 5,000 types electrical equipment to become a power producer, generating electrical power from solar energy resources. This plant is the first solar power plant of GUNKUL located at Baan-Kluai, Chon-Daen, Petchaboon.

Technical Specification
Project name : Gunkul Powergen: Baan-Kluai branch
Location : Baan-Kluai, Chon-Daen, Petchaboon
Type : PV Power Plant
Capacity : 3.3 MWp
Start : June 2010
Finish and COD : 4th January 2011
Installation of Baan-Kluai
Site preparation
Construction of foundation
Mounting Structure
Mounting Solar Modules
Switch Gear
Inverter
Monitoring
Finish Installation (View 1)
Finish Installation (View 2)
Finish Installation (View 3)
Finish Installation (View 4)
  • Supply High, Medium and Low Voltage of electrical products
Year : 2010
Scope of Service    
Customer : Electricity Generating Authority of Thailand (EGAT) : 37 projects
Metropolitan Electricity Authority (MEA) : 44 projects
Provincial Electricity Authority (PEA) : 32 projects
TOT Public Company Limited : 2 projects
Department of Alternative Energy Development and Efficiency (DEDE) : 1 projects
State Railway of Thailand (SRT) : 1 projects
  • Supply High, Medium and Low Voltage of electrical products
  • Wind Turbine Project
Year : 2009
Scope of Service    
Customer : Electricity Generating Authority of Thailand (EGAT) : 67 projects
Metropolitan Electricity Authority (MEA) : 55 projects
Provincial Electricity Authority (PEA) : 37 projects
TOT Public Company Limited : 2 projects
Department of Alternative Energy Development and Efficiency (DEDE) : 2 projects
CAT Telecom Public Company Limited (CAT) : 2 projects
State Railway of Thailand (SRT) : 1 projects

Renewable Energy is the clean energy from wind, water, solar, waste, etc which will be very important in the near future and this business can be grow up very fast in Thailand. Gunkul Engineering Co., Ltd. have started to do the renewable energy business by import the 1st MW class wind turbine to Thailand supply and supervision of installation the wind turbine 2 x 1.25 MW to Electricity Generating Authority of Thailand (EGAT) at upper reservoir Lamtaklong Pumped Storage Power Plant, Nakhonratchasrima Province.

Technical Specification
Type : Three blades, variable speed, horizontal shaft Turbine with double-fed induction generator and Pitching control
Rotor Diameter : 64 m
Hub Height : 68 m
Total Height : 100 m
Tower : Tubular steel tower
Wind class : IEC IIA
Rated Power : 1,250 kW
Cut-in wind speed : 2.8 m/s
Rated wind speed : 12.3 m/s
Cut-out wind speed : 23 m/s
Installation of Wind Turbine
Wind turbine arrive at port
Construction of foundation
Erection of Tower
Installation of Nacelle
Installation of Rotor
Finish Installation
  • Supply High, Medium and Low Voltage of electrical products
Year : 2008
Scope of Service    
Customer : Electricity Generating Authority of Thailand (EGAT) : 91 projects
Metropolitan Electricity Authority (MEA) : 53 projects
Provincial Electricity Authority (PEA) : 60 projects
TOT Public Company Limited : 1 projects
CAT Telecom Public Company Limited (CAT): 2 projects
State Railway of Thailand (SRT) : 1 projects